Fast-Track Quote
We respond within 2 business hours.
Epoxy floors, steel deck coatings, and line markings across facilities up to 1M sq ft — completed during your off-hours. OSHA-compliant. Zero operational downtime.
Project Transformations
Drag the slider. Every project below was completed during off-hours without halting operations.
Oil-saturated concrete in a compressor room — stripped, shot-blasted, and sealed with 100% solids epoxy. Forklift-rated at 8,000 lbs, non-slip aggregate broadcast, back in service Monday morning.
Rust-through on exposed I-beams and mezzanine decking. Abrasive blasted to SSPC-SP6, primed with zinc-rich epoxy, topcoated with intumescent fireproofing — rated to 2-hour fire resistance per IBC.
Full aisle re-stripe across three connected buildings: pedestrian corridors, forklift lanes, dock staging zones, and OSHA 1910.22 floor marking compliance. Completed across four weekend shifts — zero order disruption.
What We Apply

100% solids, water-based, and urethane mortar systems. Mil thickness specified per traffic load — 8 mil maintenance coat to 125 mil broadcast mortar for heavy forklift environments.
Zinc-rich primers, epoxy intermediates, intumescent topcoats. IBC 2-hr fire ratings.
Aisle lanes, dock staging, pedestrian corridors, hazard zones — compliant and crisp.
Moisture-tolerant epoxy and polyurethane systems rated to −20°F. Applied during scheduled defrost cycles — no product movement, no cold chain disruption.
We scope, schedule, and mobilize in 72 hours for compliance-critical jobs.
From the Field
"Coat re-striped our entire 185,000 sq ft fulfillment center across three weekends. Monday morning first-truck arrived to razor lines. OSHA audit passed. Zero complaints from ops."
Derek Molloy
Facility Manager, Northeast Logistics Hub
"We had a plant audit in six weeks and corroded mezzanine decking. Coat came in, blasted to bare metal, applied intumescent coating, and gave us the 2-hour fire rating documentation we needed. On time, on spec."
Priya Nair
Plant Engineer, Advanced Manufacturing — Chicago, IL
340+
Facilities Coated
18M
Sq Ft Completed
100%
On-Time Completion
11 Yr
Epoxy Warranty
MIL thickness charts, VOC ratings, cure windows, and OSHA compliance notes for every system we apply — epoxy, polyurethane, intumescent, and urethane mortar.
Ready to Start
From a 2,000 sq ft compressor room to a 500,000 sq ft distribution campus — we scope, schedule, and coat on your terms.
We mobilize in 72 hours for compliance-critical jobs